Showing posts with label Lucas Valley Road sidewalk construction. Show all posts
Showing posts with label Lucas Valley Road sidewalk construction. Show all posts
Tuesday, September 11, 2012
The first thing they had to do:
Monday morning, September 10, 2012 the construction of the sidewalk for Safe Passage along Lucas Valley Road begins with cutting back the shrubbery so that the construction crews will have access to the planned sidewalk location.
Subscribe to:
Posts (Atom)
